Gaffney High School in Gaffney, S.C., wanted a new training and strength facility adjacent to its stadium that represented the rich football tradition at the school. The 8,000 square foot building was sided with McElroy Metal ribbed metal panels coated in the school’s color.
“It’s a free-standing building, built adjacent to the football stadium,” says Ron Smith, Managing Principal, McMillan Pazdan Smith Architecture of Spartanburg, S.C. “It had to have some elements that enhanced the athletic department and the stadium. We were on a bit of a tight budget, so we wanted a cost-effective functional facility.”
McElroy Metal’s Wave Panel was installed vertically on the metal building in two Sherwin-Williams Fluropon PVDF colors – Surrey Beige (7,000 square feet of 22-gauge) and Matte Black (200 square feet of 24-gauge). The Wave Panel is a 16-inch concealed fastener wall panel with 3/4-inch-deep ribs, designed to be installed horizontally or vertically over a solid substrate or sub-framing to provide clean, visually appealing lines for both new construction and retrofit projects.
“We really liked the looks of the vertical element,” Smith says. “It gives it a little bit of its own design look. Metal was the cost-effective choice that provided durability and helped the project be completed on time.”